A new state-of-the-art assembly and testing facility that builds jet engines, was built at this site in Hucknall, costing over £30 Million.

requirements

Over 80 meters of demountable flood defence barriers were supplied and installed to provide protection from flooding at times of heavy downpours.

Reason for requirement

When the plant was built it was flooded on a number of occasions. This was due to the aging and inadequate drainage system. Floodsense was invited to the site to carry out a survey and offer advice and recommendations to the senior management team.

Specifications

A number of flood barriers were installed on single and double doors as well as roller shutter doors around the site, this included the installation of stainless steel thresholds to provide a watertight seal.