Floodsense

Case Study

Underdale Road - Shrewsbury

Property:

3 detached properties, Shrewsbury

Requirements:

Temporary Demountable Flood Defence systems across the three properties including reinforced concrete foundations and reinforced walls between properties.

Reason for requirement:

During heavy downpours further up in the Welsh mountains, the River Severn rises well over 25 ft resulting in the three detached properties above being flooded on three separate occasions.

Specifications:

Three 11-meter Temporary Flood defences spanning the entire rear of each individual property. A reinforced concrete foundation 1-meter deep was required to accommodate the System’s demountable posts. Reinforced brick walls were built between each property to accommodate the rails of each System and to enclose the ends of each garden.

Screenshot 2020-03-06 at 12.39.24
IMG_0352.a76ef047d8d24c03823acdf41c4ee7c8 (1)
stc_logo_4

1) Reinforced concrete foundations installed along the rear of each property

IMG_0118.a76ef047d8d24c03823acdf41c4ee7c8
IMG_0128.a76ef047d8d24c03823acdf41c4ee7c8

2) Reinforced brick walls built between each property to accommodate rails of each System, in filled with C40 concrete.

IMG_0124.a76ef047d8d24c03823acdf41c4ee7c8
IMG_0130.a76ef047d8d24c03823acdf41c4ee7c8

3) Reinforced concrete foundations marked out and core drilled to accommodate demountable posts.

IMG_0284.a76ef047d8d24c03823acdf41c4ee7c8
IMG_0287.a76ef047d8d24c03823acdf41c4ee7c8

4) Core drilling completed and inserts ready to be installed, inserts and demountable posts installed

IMG_0308.a76ef047d8d24c03823acdf41c4ee7c8
IMG_0354.a76ef047d8d24c03823acdf41c4ee7c8

5) Flood protection barriers completed and a spot of landscaping to finish off.

IMG_0363.a76ef047d8d24c03823acdf41c4ee7c8
IMG_0352.a76ef047d8d24c03823acdf41c4ee7c8 (2)